Second Year Interior Finish Blog:Week 7

Image
Second Year Interior Finish Blog Week 7: Tuesday-Oct 8:   On this day we were working on the window sill and extension jamb. To make the sill board, we took some measurements of the window width (24"), the reveal(1/4"), extension jamb thickness( 3/4"), casing(2 5/8")and an extra 3/4".  This will be the finish size of the ears, but to start we will add a few inches for when we have to trim down the piece to fit in the opening better.  The extension jamb is 2 1/4" wide and 3/4" thick. We measured the opening and added a 1/4" reveal around the jamb. I fastened the pieces together with 7d box nails. Thursday-Oct 10:   Today I used a router to route the edges on the sill. I used a 1/4" round over bit. Next I nailed the sill to extension jamb with 7d box nails and then kreged the sides and top of the extension jamb to the jamb.

Second Year Interior Finish Blog:Week 6

Image
Second Year Interior Finish Blog Week 6: Tuesday-Oct 1:   On this day we started on the window project. These photos you are looking at the jamb frame. The next few photos are of me using the Kreg machine to kreg together the outside trim. Thursday-Oct 3:   Today I finished Kregging the outside trim, sanding, fastening the outside trim to the jamb with 4d nails. Next I fastened the whole thing in the window rough opening. 

Second Year Interior Finish Blog:Week 5

Image
Second Year Interior Finish Blog Week 5: Tuesday-Sep 24:   Today we were working on the base moulding. These boards were 3 1/2" wide and 3/4 thick. We cut and mitered them to the correct measurements and fastened the boards on with 4d and 6d nails. I also finished the door casing, sanding and etc.  Thursday-Sep 26: Today we were all working on our own base cap moulding for the top of our base moulding. These are a couple photos of me sending the stock through the moulder.

Second Year Interior Finish Blog:Week 4

Image
Second Year Interior Finish Blog Week 4: Tuesday-Sep 17: On this day, we were going over the block we were making for the base moulding to wrap around. This is acting as a wall that divides a room. This was created of three 2x6 boards cut to 12" that were fastened together with screws. We made two of these and fastened them to a stud and the floor.Next we nailed on the base moulding. Thursday-Sep 19:   Today's class, we were going over how to create a cope for the base cap moulding. Once the moulding has been sent through the moulder, you would cut one side at a 45 degree angle and then made a mark around the edge of the 45 with your pencil. Next, using a coping saw, cut the shape of the moulding out taking mostly out of the backside of the trim that won't be seen. 

Second Year Interior Finish Blog:Week 3

Image
Second Year Interior Finish Blog Week 3: Tuesday-Sep 10:   Today I was finishing up with installing the door. Once I was done, I started making the casing trim for around the door. This casing was the same size and shape as the window mock casing we did.  Thursday-Sep 12: Today I was continuing to work on the door casing. Planning, jointing, and ripping boards

Second Year Interior Finish Blog:Week 2

Image
Second Year Interior Finish Blog Week 2: Tuesday-Sep 3:   Today we were practicing chiseling out  two boards for the hinges to sit flush with the face of the boards. Next we put casing around this window set up. First we planned a board, run it through the jointer and then rip to desired width. For these casings, we went with 2 5/8" for the width because that was the width for the moulder template. Next step, we ran the ripped boards through the moulder. It is required to send the board through in 3 increments at a time til you reach the desired shape. In this case, we started the first pass at 1 11/16" then 1 5/8" and then 1 9/16" but no lower than 1 1/2". Cut 45 degrees miters and nailed them on with 4ds on the inner trim and 6ds on the outer. Thursday-Sep 5:    On this day we were installing our doors for our cubicles. Once the door is plumb and the reveal around the door and the jamb is equal all around; we place shims right at t...

Second Year Interior Finish Blog:Week 1

Image
Second Year Interior Finish Blog Week 1: Tuesday-Aug 27: Today was the first day back. We started the out with replacing the damaged drywall sheets with new sheets. I'd cut right along on half of the stud and remove the screws. Next, I measured the height and width of where I removed the old piece of drywall, cut and fit the piece in and screwed it to the studs. Thursday-Aug 29: Today we started off with a demo for applying mud on the drywall. In the two photos you'll see the corner paper being applied and then the drywall mud applied on the paper to keep it in place. Next we cover the screws.