Second Year Interior Finish Blog:Week 2

Second Year Interior Finish Blog

Week 2:


Tuesday-Sep 3:

 Today we were practicing chiseling out  two boards for the hinges to sit flush with the face of the boards. Next we put casing around this window set up. First we planned a board, run it through the jointer and then rip to desired width. For these casings, we went with 2 5/8" for the width because that was the width for the moulder template. Next step, we ran the ripped boards through the moulder. It is required to send the board through in 3 increments at a time til you reach the desired shape. In this case, we started the first pass at 1 11/16" then 1 5/8" and then 1 9/16" but no lower than 1 1/2". Cut 45 degrees miters and nailed them on with 4ds on the inner trim and 6ds on the outer.


Thursday-Sep 5: 


 On this day we were installing our doors for our cubicles. Once the door is plumb and the reveal around the door and the jamb is equal all around; we place shims right at the hinges and and screw them. 






Comments